The N117 is expected to enter series production in mid-2012.

Related Links

  • Nordex
  • Elsevier Ltd is not responsible for the content of external websites.

News

Nordex installs the first of its N117 wind turbines

Nordex is one step closer to series production of the N117/2400 onshore wind turbine with the installation of the first unit at the Stadum citizens’ wind farm in Schleswig-Holstein, Germany.

By Kari Williamson

The N117 wind turbine has a rotor diameter of 117 m and a rotor sweep of 10,715 m2.

In typical IEC-3 locations, the N117 wind turbine is said to achieve a capacity of over 3500 full-load hours, exceeding other turbines in this category by 20%, meaning a capacity factor of 40%.

With a length of 58.5 m, this is Nordex’s first blade to be made from carbon fibre, which gives a weight of only 11 tonnes.

The N117 is expected to enter series production in mid-2012.

The wind turbine installed at the Stadum site has a hub height of 91 m, and is expected to produce around 9.9 GWh annually at am average wind speed of 7.4 m/s.

Share this article

More services

 

This article is featured in:
Wind power