The contract covers inspection of the elevator and service lifts for an offshore wind farm entailing 80 turbines of AREVA Wind’s model M5000. The wind farm, with an area of 41 square kilometers, is located in the German Exclusive Economic Zone at a distance of about 180 kilometers west-northwest of Bremerhaven. With this large distance to the North Sea coast, the wind field is situated outside the Wadden Sea National Park and the 12-nautical-mile zone.
The project begins in early 2014. .