By Kari Williamson
The 30 MW operational Alto do Seixal wind farm near Lugo consists of 6 Gamesa G80-2.0 MW wind turbines and 9 G87-2.0 MW wind turbines.
The 12 MW Les Forques II wind farm outside Tarragona will be equipped with 6 G90-2.0 MW wind turbines and is scheduled to begin commercial operations in the second quarter of 2012.
No financial details of the deal have been released.