By Sania Farooqui
The company has anticipated an annual yield of 4 GHW.
According to Roberto Mandruzzato, Managing Director of Verde Energia s.r.l, part of the Lannutti Group: “aleo solar’s modules are designed to have a particularly long service life and are optimised to maximise yields.”
The solar photovoltaic (PV) plant which was connected to the grid on 25 November 2010 was installed by the Cuneo-based firm Giordano & C. S.p.a. The aleo modules have been installed on the roof of the company building.