The systems will be used in Doosan’s onshore and offshore 3 MW fully conversion turbines. The electrical control systems will be shipped to Doosan between the middle of 2011 and the middle of 2012.
Greg Yurek, Founder and CEO of AMSC says: “With the offshore wind market in Asia now entering a phase of rapid growth, we expect multi-megawatt wind energy systems such as Doosan’s WinDS3000 will be in increasingly high demand.”
South Korea announced a US$10.5 billion project to develop 2.5 GW of offshore wind power in November 2010.