Converteam has developed a high temperature superconducting hydropower generator that could also be transferred for wind power applications.
28 February, 2011
The UK Energy Minister has seen a strong interest in marine energy technology for the European fund.
22 February, 2011
Two small hydropower plants in Brazil will use Alstom’s specialised hydropower plant equipment.
16 February, 2011
Alstom signs a €500 million contract with Norte Energia de Brazil to provide hydropower equipment for the 11,230 MW Belo Monte Dam, Brazil.
14 February, 2011
AECOM and Electricité de France (EDF) have been awarded US$13.4 million feasibility study for Grand Inga hydropower site on Congo River in the Democratic Republic of Congo.
03 February, 2011